PROVIDING CIVIL CONSTRUCTION SOLUTIONS ON TIME, SAFELY, AND UNDER BUDGET.

Extensive range of heavy equipment and skilled operators.

REQUEST A BID

Call or email us today for a quote or submit an inquiry below.

Call Eric Van Hemelryck at 406-633-0853 or email evanhemelryck@weaveind.com

Our Specialty

 

Weave Construction has the expertise and equipment needed to complete the most challenging heavy construction projects.  We pride ourselves on beating schedule and project specifications for both the public and private sectors.  Operating with multiple concrete and civil grading crews, along with the full support of Weave Industries, we specialize in the following types of construction work:

  • Complete site work packages including grading, foundation preparation, underground utilities, paving and landscaping
  • Concrete flatwork including curbs, sidewalks, valley gutters and retaining walls
  • Street and pathway construction and rehabilitation
  • Specialty recreational facilities including artificial turf fields and campgrounds
  • Large-scale earthwork including reservoirs, landfills, bank stabilization and site reclamation
  • Material transportation, handling, and placement
  • Demolition
  • SWPPP/BMP Installation and maintenance

Weave Construction has a team of qualified personnel with strong backgrounds in engineering, construction, and equipment operation.  Our focus is on providing exceptional customer service and a safe, efficient worksite that keeps projects moving forward on time and under budget.

Project Highlights

Billings Oasis Wave Pool construction Weave

Hooper Street Improvements – 2025 – Big Timber, MT

Street improvements that included new curb & gutter, sidewalks, valley gutters and new pavement.

Colstrip Pickleball Courts – 2025 – Colstrip, MT

Removed old tennis courts and constructed new pickleball courts for the City of Colstrip.

Oasis Wave Pool – 2024 – Billings, MT

Excavation for new wave pool, new concrete sidewalks and expanding existing parking lot.

Fly Creek improvements Weave Construction

General Dollar Store – 2024 – Shepherd, MT

Site earthwork, building excavation and backfill.  Concrete sidewalks, curb & gutter and construction of new parking lot.

MDT Fly Creek – 2024 – 15 Miles West of Hardin, MT

Fix erosion caused by flooding under the Fly Creek Bridge on Old Highway 87.  Included placing grouted rip rap, excavation and seeding.

EMEDA Site Development – 2024 – Baker, MT

Construction of new parking lot and street improvements for new community center.ZooMontana Construction Weave Industries

Zoo Montana Parking Lot Improvements – 2023 – Billings, MT

Project scope included excavation, gravel placement, curb & gutter, storm drain improvements and paving the parking lot at Zoo Montana.

Skyline Trail – 2023 – Billings, MT

A combination of asphalt and concrete trail spanning 3 miles with multiple paved parking lots and Recon gravity walls located immediately south of Highway 3.

South 4th Street – 2023 – Laurel, MT Skyline Trail Montana Road Improvements

Full road and sidewalk reconstruction of a through street and multiple side streets including demolition, utilities, paving and concrete.

Billings Logan International Airport – 2023 – Billings MT.

Demolition and civil site work for a new airport terminal.

Town Pump #13 – 2022 – Billings, MT

To date, the largest Town Pump in Montana.  Work included foundation excavation, gravel placement, utilities, paving and all sitework concrete.D Miller Ranch

Carverss Steakhouse – 2022 – Billings, MT

Civil site work for one of Billings’ finest restaurants.

Police Shooting Range – 2022 – Billings, MT

Complete overhaul of an existing shooting range fashioned with HESCO barriers and concrete walkways.

Landon’s Legacy, Poly Vista Park – 2022 – Billings, MT

Sitework and grading for a rubberized baseball field built for children with disabilities.D Mitchell Ave

Red Lodge High School CTE Building – 2021 – Red Lodge, MT

Civil construction services for a new building annex and parking lot next to an existing school.

J.E. Corette Plant Site – 2020 – Billings, MT

Reclamation of the Talen Energy facility.

Riverside Campground Project – 2020 – Laurel, MT

Complete Renovation of a campground facility.

Quietus Road Gravel Resurfacing, Bighorn Horn County – 2019 – Hardin, MT

Resurfacing and shaping of gravel roadway.

City of Billings Wastewater Treatment Plant – 2019 – Billings, MTD ZOO

Removal and haul-off of pond sludge.

Interested in a construction career?

We want to talk to you!

Be home nights and weekends.
Get off the road, attend family activities and make a great living!
Work/life balance is important at Weave Industries!

Interested in a construction career?

We want to talk to you!

Be home nights and weekends.
Get off the road, attend family activities and make a great living!
Work/life balance is important at Weave Industries!

DIVISIONS    SERVICES    EMPLOYMENT    ABOUT    CONTACT

© 2025 Weave Industries